List of our most important projects (1978-2006)
Page  1  2  3  4  5  6  7  8 
 
 
Year
Typology
Activity
Client
Italy
1999

S.G.C. FI/PI/LI Access to the Port of Livorno – Lot No. V – (abridged part of a law) No.I
Construction Plan, Static Calculation, Technical Assistance
ATI
STEIAM
IR Imprese Riunite

Italy
2000

METROLIGHT Innovative Transport System Tor de’ Cenci – Predesign Predesign, Assistance in the submittal procedures
MM Metropolitana Milanese
Italy
1999-2002

A3 Motorway SALERNO-REGGIO CALABRIA Modernising and adaptation trunk No. 1 - section No. 5 – lot No. 5 Final design and Construction Plan
ANAS DG
Italy
2000
DG 2/2000 Rome Orbital  (G.R.A.) adaptation and enlargement to  3 lanes for each way Construction Plan ANAS DG
Italy
2001-2002

Road extension along the Val Piomba Predesign, Feasibility  Plan and Environment Assessment
Provincia di Teramo
Italy
2000-2003

Environment Impact Study  and Final Design  DG 15/00 Roads nearby the Motorway between Rome and Fiumicino Execution of service roads
ANAS Compartimento per il Lazio
Italy
2002-2003

New high Speed Railway between Venice and Trieste section Ronchi-Trieste Support in the carrying out of the specific designs needed for Predesign ITALFERR S.p.a.
Italy
2002-2003

DG 46/00 Freeway between Foggia and S. Giovanni Rotondo Final design, Environment Impact Study  and Economic  Situation Survey
ANAS DG
Italy
2001-2003

Alternative route of  SS71 Umbro Casentinese alternative route section Castiglion del Lago Predesign – Final Design – Construction Plan Regione Umbria
Italy
2002-2003

Main road network at Fiera di Roma (Rome) Final design and Construction Plan Impresa Lamaro
Italy
2001-2004

SS38 Freeway completion of by-pass at Sondrio Final design and Construction Plan
Regione Lombardia
Italy
2002-2003

A24 Motorway between Romeand Teramo. Viaducts Pič di Pago No. 1, No. 2, No.3 and S.Angelo  No.1,No.2, No.5 Construction Plan of the structural reinforcement of beams Autostrada dei parchi
Italy
2002-2003

Goods shunt at Rome junction Predesign ITALFERR S.p.a.
Italy
2003-2005

A1 Motorway between Milan and Naples section  between Barberino M. and Incisa V.Enlargement to 3 lanes Final design Spea S.p.a.
Italy
2005-in corso

Maxilot No. 2 DG24-03 Motorway between Salerno and Reggio Calabria Final design for main contractor
IMPREGILO
Condotte d'Acqua
Italy
2004

By-pass road of Mestre Final design TECHNITAL S.p.a.
Italy
2005-in corso

Maxilot  No.3 DG87-03 Motorway between Salerno and Reggio Calabria. Final design for main contractor
IMPREGILO
Condotte d'Acqua
Italy
2004-2005

A24 Motorway section between Villa Vomano and Teramo – completion of the motorway route Environmental Impact Study
Autostrada dei parchi
Italy
2004-2005

External alternative route by-pass and road traffic at Albinia Environment Assessment – Technical Services ANAS - Compartimento della Toscana
Italy
2004-in corso

SS106 Ionica modernisation, new route, section Mandatoriccio Amendolara – Lots form No. 1 to No. 11 (Megalot No.8) Predesign and surveys needed for the Environmental Impact Study
ANAS
Italy
2004

By-pass of Piacenza Predesign Support
Ing. Francesco La Camera