Year |
Typology |
Activity |
Client |
Italy
1996 |
S.G.C. Florence/Pisa/Livorno access to the Port of Livorno -
Lot V
|
Final Design
Coordinatore progett.:
Eng.E.Moroni
|
Ing.
F. M. LA CAMERA |
Italy
1997
|
Service area “Sala Consilina Est”
Service area “Sala Consilina Ovest”
Service area “Bisignano Est” |
Lanes Study
Changes in the parking area
|
AGIP
Petroli Spa |
Italy
1997 |
Shop in Grosseto: Poggione Ovest, Service Area at Bisignano
– Service Area Arino, North and South – Service Area
Masseria, North and South |
Design concerning the change, transformation, execution and
maintenance of the distribution plant. Miscellaneous
Engineering.
|
AGIP
Petroli Spa |
Italy
1997 |
Contract Award for the design of several infrastructures of
the Municipality of Rome |
Predesign
|
COMUNE
DI ROMA Ripartizione VII |
Italy
1997 |
Design for the adaptation of the alternative route of SS.3
Flaminia between Spoleto and Foligno |
Design for the adaptation of the alternative route
|
RPA
|
Italy
1997 |
Motorway between Turin and Savona Lot No.16
|
Structures Construction Plan, Tunnels and Viaducts
|
COOPSETTE
Scarl
|
Italy
1998 |
Urbanization works and relevant facilities for the New
Agronindustrial Centre in Rome |
Construction Plan of Urbanization works and relevant
facilities
|
Consorzio
AGROROMA
|
Italy
1998 |
SS.1 Aurelia – Enlargement to 4 lanes. Joint-venture RPA/STE/italprogetti
– Stake owned by STE 33% |
Final Design, Construction Plan and e studio di impatto
ambientale. Adaptation through enlargement to 4 lanes at the
CNR III SS1 Aurelia section km 122+372 and km 136+200.
Design of adjacent frontage level road CNR VI
|
Provincia
di GROSSETO |
Italy
1998 |
Autostrada Rome-Fiumicino 2nd lane – Lot II from km 10+800
to km 14+000 |
Executive Plan
|
AURELIA
2000 Scarl |
Italy
1998 |
SS.156 “Monti Lepini” – Section between Prossedi and Latina.
Final Design and Construction Plan
|
Final Design and Construction Plan, Final design completed.
Construction Plan under in progress
|
Ing.
F. M. LA CAMERA |
Italy
1998 |
SS.3 Flaminia – Environmental Impact Assessment |
Environmental Impact Study
|
ANAS
Perugia
|
Portogallo
1998 |
Sfercia-Colle Sentino. Final Design, Environmental Impact
and Construction Plan. ATI/Tecnoproject/STE/Consult
Internation Stake owned by STE: 33% |
Final Design and Environmental Impact Study
|
Provincia
di MACERATA |
Italy
1998 |
Rome Orbital (G.R.A.) and Northern access to A1 Motorway
|
Final design and Construction Plan
|
PORTA
DI ROMA |
Italy
1998 |
Province of Vibo Valentia. Road crossing the “Serre” – lot
No. 2°.
Engineers’ Association:
La Camera(mandatary)/Laganą/Mauro/Spezzano/Izzi |
Construction Plan
|
Ing.
F. M. LA CAMERA |
Italy
1998 |
High Speed Railway between Rome and Naples Road connection
of the “Nuova Stazione Campana”
|
Construction Plan
|
BONIFICA
Spa |
Italy
1998 |
A1 Motorway Milan/Naples. Adaptation of the section crossing
the Apennines between Sasso Marconi and La Quercia Lot No.I°
Road works included in the Project. From km199+520 to km
206+412, of the relevant service roads (Prevam) and of the
intervention on the external road traffic (S.S.325 Val di
Setta and S.S. 64 Porrettana)
|
Construction Plan
|
SPEA
Spa |
Italy
1998 |
A3 Motorway SALERNO-REGGIO CALABRIA Modernising Works and
adaptation trunk No. 3° - section No.2° - lot No. 3° (DG
62/97) from km 369+800 (excluding the junction at Mileto) to
km 383+000 (including the junction at Rosarno)
|
Final design, Construction and Safety Plans. Assignment by a
Joint Venture: BONIFICA (M) – STE
|
ANAS
Direzione Generale |
Italy
1999 |
A3 Motorway SALERNO-REGGIO CALABRIA Modernising Works and
adaptation trunk No. 2° - section No.2° - lot No. 1° - (by
abridged part of a law) No.2° (DG 31/99) From km 169+100 to
km 173+900 |
Final Design and Environmental Impact Study Assignment by
ATI: PROGER (M) – STE – COALPA
|
ANAS
Direzione Generale |
Italy
1999 |
A3 Motorway SALERNO-REGGIO CALABRIA Modernising Works and
adaptation trunk No. 2° - section No. 1° - lottNo.2° -
(abridged part of a law) No. 1° (DG 28/99) From km 153+400
to km 159+000
|
Final Design and Environmental Impact Study Assignment by a
Joint Venture: TECNOPROJECT (M) – STE
|
ANAS
Direzione Generale |
Italy
1999 |
A3 Motorway SALERNO-REGGIO CALABRIA Modernising Works and
adaptation trounk No. 1° - section 5° - lot 5° (DG 1/99)
from km 53+800 to km 60+500 (including junction at Sicignano)
|
Final Design, Construction Plan, Environmental Impact Study
and Safety Plan Assignment by a Joint Venture STE (M) –
PROGER – COALPA – ALTIERI
|
ANAS
Direzione Generale |